The New Indianapolis Airport will offer opportunities for business and economic development, employment and growth to Indiana companies and citizens across the state.

For more information about doing business with the New Indianapolis Airport and the Midfield Terminal Project, please select from the links above.

 
   
   
   
   
    BID PACKAGES PENDING AWARD:
 
   BP# Description   Bid Date
   Glycol Storage Pad & Ground Service Equipment (GSE) Fueling Area Package    
 



Click here to download: Glycol Storage Pad & Ground Service Equipment (GSE) Fueling Area Package Bid Tab Completed

2
H28 Terminal/Concourse Furniture   May 22 
 

Furniture, modular office systems, etc. to be furnished and installed in the Terminal, Concourse, PARCS Building and Garage Transportation Center.

Click here to download: H28 Bid Tab Completed

TVS Television Services   March 14 
 

The Indianapolis Airport Authority (IAA) is issuing this Request for Proposal (RFP) for qualified vendors to provide cable television service in the New Indianapolis Airport terminal building and surrounding midfield campus. The new terminal is scheduled to open in late 2008.

Click here to download: Details regarding tour of New Indianapolis Airport campus for potential respondents TVS RFP

Click here to download: TVS RFP

       
CAE Cargo Apron Expansion - Phase 3 Package   January 1
IAA Package # I-07-008

Click here to download: CAE Bid Tab Completed
DAS Use of Distributed Antenna System (DAS) by Cell Phone Carriers to Provide Cell Phone Coverage/Service   January 1 1
The Indianapolis Airport Authority (IAA) is issuing this Request For Proposals (RFPs) for qualified vendors to provide cell phone services through the Distributed Antenna System (DAS) in the new Indianapolis Airport terminal building, Ground Transportation Center (GTC), parking garage, and cell phone lot. The New Indianapolis Airport is scheduled to open in late 2008.

Click here to download: DAS RFP
Hotel Hotel Facility   September 14 2006
The design, development, construction and operate a new hotel facility with a minimum of 250 rooms to be located in an area adjacent to the new Indianapolis Airport Terminal Building Parking Garage.

Click here to download: Hotel RFP Addendum 1
Click here to download: Hotel RFP Addendum 2
Click here to download: Hotel RFP Addendum 3
Click here to download: Hotel RFP Addendum 3b
Click here to download: INDHotelRFP 061606
NTGA North Terminal Garden Artwork   December 21 2007
One free-standing work of art to remain on display in the North Terminal Garden for two (2) years.

Click here to download: NTGA
T51 Landside Pavement Markings   April 2008
Pavement Marking for Main Entry and Exit Roads and Surface Parking Lots.

Click here to download: T51 Bid Tab Completed
T48 QTA Building   Aug, 2007
Buildings and canopies for QTA
Click here to download the Summary Bid Tabulation for this project.
T24 Parking Garage Sitework & Road Extension   July 16, 2007
This package provides civil work for Garage Entrance and Exit including roads and final grading between the garage and ticketing stations and between the garage and exiting tollbooths.
Click here to download the Summary Bid Tabulation for this project.
T25 Parking Garage landscaping   July 10, 2007
Garage (east elevation) Landscaping – This package provides for the preparation, installation, and maintenance of all prescribed landscape and hardscape activities associated with the area east of the east elevation of the garage and bordered by the enplane/deplane road on the west.
Click here to download the Summary Bid Tabulation for this project.
T14 Deicing Phase 3 — Equipment /Fitout   July 3, 2007
This package provides pumps and associated header pipe at the deicing facility and equalization pond. It also includes electrical gear and controls for the equipment at the deicing facility and equalization pond. The cabling, final connection and testing for all electrical equipment and controls is also included.
Click here to download the Summary Bid Tabulation for this project.
F04 Fuel Storage Facility — Pumps   May 15, 2007
This package provides for the procurement of four (4) 1,500 gpm pumps for the Hydrant Fuel System. The pumps will be assigned to the mechanical contractor for installation and commissioning.
Click here to download the Summary Bid Tabulation for this project.
Indianapolis Airport Authority Seeks Marketing Firm
March 23, 2007
The Indianapolis Airport Authority seeks a marketing firm to assist in the development of a marketing concept/theme to target potential concessionaires, design and produce marketing collateral, and oversee print production of all deliverables. Interested marketing firms should read the instructions contained in the attached letter and respond accordingly.
  Click here to download instructions for this opportunity.
  Questions should be directed to: MidfieldRFPs@newindianapolisairport.com